...

Lascelles Manor, Toorak

Lascelles Manor is located in Toorak, one of Melbourne’s most established and architecturally refined suburbs. The project highlights a modern approach to brick construction, combining traditional craftsmanship with advanced brick cutting in Melbourne to achieve a premium architectural outcome.

Lascelles Manor Toorak Project | Brick Cutting in Melbourne
Lascelles Manor Toorak Project | Brick Cutting in Melbourne

Project Information

Builder
architectus
Architect
Precast
Brick Cutter

Project Status: Completed

Project address: Victoria, Australia.

Form Brick’s Role

Lascelles Manor was the first major project delivered using Form Brick’s newly developed automated brick‑cutting equipment — designed and built in‑house at the Form Brick factory. This milestone marked a significant step forward for brick cutting in Melbourne, providing consistent, high‑precision brick facings for the façade.

“The bricks were delivered to site where they were fixed to the building.”

Lascelles Manor Toorak Project | Brick Cutting in Melbourne

The automated system ensured accuracy, reduced manual handling, and allowed the builder to work with brick facings that met exact architectural specifications.

Façade and Architectural Expression

The façade is constructed from Daniel Robertson Hawthorn Black, a brick known for its deep tone and textured finish.

Lascelles Manor Toorak Project | Brick Cutting in Melbourne

To achieve the architectural detailing envisioned for Lascelles Manor, the project combined:

  • Brick facings produced by Form Brick
  • Hand‑laid bricks installed by the builder
  • A hybrid method supported by Form Brick’s advanced brick-cutting equipment.

This approach enabled LU Simon to deliver intricate brickwork elements — including corners, reveals and decorative transitions — at less cost than constructing the entire façade with traditional bricklayers.

Sustainability and Efficiency

  • Automated cutting reduced waste and improved material efficiency.
  • Brick facings lowered structural load compared to full brick construction.
  • The brick inlay system supported faster installation and reduced on‑site labour time.
  • The combined approach maintained the premium look of hand‑laid brickwork while improving overall project economy.
Lascelles Manor Toorak Project | Brick Cutting in Melbourne

Vision

Lascelles Manor reflects Form Brick’s ongoing vision: To give every project — large or small — access to lightweight brick cladding using cut brick facings made from any brick available on the market.

Lascelles Manor Toorak Project | Brick Cutting in Melbourne

 

Image sources: Form Brick, and the Internet.

Shaping Architectural Brilliance in Brick.​

Be our next customers! We are happy to assist you to bring the project come to life.

Scroll to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.